Our installation team participated in educational visit for wind-energy in nearby school.
The 80m masts in Zambia have special anchors driven in soil with hydraulic jackhammer, locked and tested with hydraulic tester.
One of two 80m masts in Zambia that have been manufactured & installed by our company.